自訂 Cookie
禁止且拒絕未經各資訊當事人同意,擅自蒐集本服務提供的使用者個人資訊資料等資料之行為。即使是公開資料,若未經許可使用爬蟲等技術裝置進行蒐集,依個人資訊保護法可能會受到刑事處分,特此告知。
© 2025 Rocketpunch, 주식회사 더블에이스, 김인기, 大韓民國首爾特別市城東區聖水一路10街 12, 12樓 1號, 04793, support@rocketpunch.com, +82 10-2710-7121
統一編號 206-87-09615
更多
自訂 Cookie
禁止且拒絕未經各資訊當事人同意,擅自蒐集本服務提供的使用者個人資訊資料等資料之行為。即使是公開資料,若未經許可使用爬蟲等技術裝置進行蒐集,依個人資訊保護法可能會受到刑事處分,特此告知。
© 2025 Rocketpunch, 주식회사 더블에이스, 김인기, 大韓民國首爾特別市城東區聖水一路10街 12, 12樓 1號, 04793, support@rocketpunch.com, +82 10-2710-7121
統一編號 206-87-09615
更多

職涯
貼文
AI 職涯摘要
이경태님은 7년 차 건축 설계 및 BIM 전문가로서 다양한 프로젝트에서 BIM 업무를 지원해왔습니다. 현재 유비에서 실장으로 근무하며 건축설계와 시공 단계의 BIM 업무를 담당하고 있습니다. 이전에는 여러 건축사사무소에서 설계 및 프로젝트 관리 경험을 쌓으며 디지털트윈과 메타버스 분야에도 많은 관심을 가지고 활동하고 있습니다.
經歷
건축설계 및 시공단계의 BIM 업무지원
- 건축 설계 및 시공 단계의 BIM 용역에서 건축 및 설비에 팀원 및 PM으로서의 업무를 담당하였다. - 사내 네트워크 구성 및 홈페이지 제작 등 전산업무도 담당하였음.
更多
學歷
[학위논문] A study on the application of BIM-based design process in railway station In the process of digitalizing core infrastructures of Social Overhead Capital (SOC) as a part of the Korean New Deal, the introduction of Building Information Modelling (BIM) to the smart SOC of railways has been receiving great attention for its strengths in the design, construction, and maintenance of buildings. Accordingly, the railway industry also strives to effectively organize and use BIM data through its “Railway BIM 2030 Roadmap” for each technology readiness level and apply and maintain sharing methods for the information. Since the current BIM for the railway infrastructure has been conducted only as pilot projects without any strategic approaches, however, it has been difficult to accumulate technologies and apply the target BIM level proposed by the Korea Railroad Research Institute. It is also difficult to establish the maintenance plan that incorporates BIM-based orders for railway stations, performance products, and data management due to the absence of BIM guidelines on railway infrastructure design with information on assigned tasks, working environments, rules and regulations, and procedures of the ordering company, the design company, and the construction company. Therefore, the purpose of this study is to review preceding studies and similar cases on BIM, to investigate strengths and weaknesses of the current railway design process based on the analysis on the status and characteristics by using IDEFO (Icam DEFinition for Function Modeling), a process analysis tool, and to suggest a BIM-based design process customized to architectural stages of the railway station design. The range of this study is limited to the design stage of the building life cycle, which was analyzed by examining the design process of railway stations through the IDEF0 modeling, a process analysis tool, investigating existing problems with the conventional design process of railway stations, and proposing a BIM-based design process.
更多
이 프로필의 담당자이신가요?
인증을 통해 현재 프로필에 병합하거나 삭제할 수 있습니다. 만약 인증할 수 없는 경우 본인임을 증빙하는 서류 제출 후 프로필 관리 권한을 취득할 수 있습니다.